Flint scheduled to install 2 new pumps at water plant - ABC 12 – WJRT – Flint, MI

Flint scheduled to install 2 new pumps at water plant

Posted: Updated:
FLINT (WJRT) - (04/23/14) - The city of Flint is scheduled to install two new pumps at its water plant, Wednesday.

Once they are on online, the plant could start providing treated water from the Flint River to homeowners in the city.

The city says it has passed all quality and safety tests to start using the river water as a replacement for water from Detroit.

Flint plans to use the river water until the KWA pipeline from Lake Huron is complete.
Powered by WorldNow

abc12.com

ABC12 Main Station
810-233-3130

Mailing Address:
2302 Lapeer Road
Flint, Michigan 48503

Powered by 

WorldNow
All content © Copyright 2000 - 2014 WorldNow and WJRT. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.